The front lawn has become the longest and most drawn out of any project I’ve worked on – it’s also the most labor intensive. Almost every Saturday, we find ourselves outside working in the yard…for the entire day. And much of the time it’s been back-breaking labor. Digging a hole in our clay/rock soil to plant a bush is a long and tiring process. And we’ve planted a lot of plants so far.

Steve and I had a date (with Briggs and Hunter in tow) at the nursery to pick out our plants. Steve wanted an easily maintained hedge to line the walkway and patio – but a hedge is made of many plants…that’s why we’ve been digging holes (which ended up being a trench) for days. Not only did we have to dig holes, but we had to run individual water lines to every single plant. Steve’s shoulders were burning from the digging and my thumbs and fingers were cramping from running all the water lines.

Another Saturday was dedicated to running low-voltage wire and hooking up LED landscape lighting.

Another Saturday was spent breaking up concrete from a previous garden bed that just so happened to be exactly where we needed to plant.

Another Saturday was spent picking out the rocks from our lawn area. I’m pretty sure the kids are tired of hearing us say every week, “Go get your shoes on, you need to go pick up rocks.”

 photo 20160318-IMG_4564.jpg
 photo 20160318-IMG_4563.jpg
 photo 20160319-DSC_6153.jpg
 photo 20160319-DSC_6156.jpg
 photo 20160407-DSC_6679.jpg
 photo 20160407-DSC_6680.jpg

I keep trying to convince Steve that we’re nearing the end – but then he lists off all the things we have left and we’re both discouraged once again. I’m not sure if I’m more excited to finish this project to get our Saturdays back or to be done tracking crazy amounts of dirt throughout our entire home.

We’re crossing our fingers that we’ll be ready for sod in three weeks – I think all of our neighbors are crossing their fingers too!